Skip to content

Temporary lane closures

As part of the new Terminal 1-Lindbergh parking ramp construction, parts of the inbound/outbound roadway system to Terminal 1 will be temporarily closed for required electrical construction operations:

  • A lane closure on the outbound roadway is scheduled to occur between 6 a.m. and 1 p.m. on Tuesday, March 22. 
  • UPDATED: A lane closure on the inbound roadway is scheduled to occur from Thursday, March 24 through Friday, March 25, and again from Monday, March 28 through Wednesday, March 30.

These closures will not affect the return to terminal loop bridge, and traffic control devices will be installed to accommodate both closures. Please obey all traffic control signage posted.